Foundations and Excavations
● Foundation Piles of 1.20 m of diameter by 18 m of depth, in the construction of a bridge over the railroad track on the Topo Chico Stream, located on the Ruiz Cortinez Avenue and Manuel L. Barragan Avenue, Monterrey, N.L. It includes: Excavation with a rotatory perforator.
● Foundation Piles of .80 m of diameter by 16 m of depth, in the construction of a bridge over the railroad track on the Topo Chico Stream, located on the Ruiz Cortinez Avenue and Manuel L. Barragan Avenue, Monterrey, N.L. It includes: Excavation with a rotatory perforator.
● Foundation and Excavation of reinforced concrete, for storage tanks, with concrete walls of 10 meters of height. Tanks:
-La Estanzuela I, of 20,000 m3
-Lopez Mateos I, of 12,500 m3
-Santa Catarina II (Extension) of 5,000 m3