Pluvial Drainage
● Pluvial drainage in "Country Naranjos" Colony, from the street Vascongadas de Parsimonia until Revolucion Avenue, in Monterrey, N.L.
● Construction of the Pluvial Drainage in the Capitán Aguilar Stream and Ricardo Margain Avenue, in San Pedro Garza García, N.L. It Consists: structure of rectangular section of reinforced concrete. This work was contracted with the Administration of San Pedro Garza Garcia, N.L.
● Construction of the San Jerónimo Pluvial Drainage with circular duct of reinforced concrete of 1.22mts of diameter, located in Monterrey, N.L. This work was contracted with the Administration of Monterrey, N.L.
● Pluvial drainage in the overpass located at the University of Nuevo Leon and Alfonso Reyes Bridge. It includes: excavation to 9.00 mts of depth, supply and installation of prefabricated concrete pipe of 1.50 mts of diameter.
● Construction of the Work in the Chupaderos Stream in the Lázaro Cárdenas Avenue, Monterrey, N.L. from the Puerto Mexico street until connecting with the channel that passes under Garza Sada Bridge. It includes the construction of circular ducts of reinforced concrete in interior diameters of 3.00, 2.80 and 1.80 meters, excavations, fillers and recovery of pavement. This work was contracted with the Municipal Administration of Monterrey, N.L.
● Construction of the pluvial drainage with circular duct of reinforced concrete, pouring in place of 1.22 meters of diameter, in the Colonial de la Sierra Colony, in San Pedro Garza García, N.L This work was contracted with the Administration of San Pedro Garza Garcia, N.L.
● Construction of the pluvial drainage with circular duct of concrete, pouring in place of 0.90 meters of diameter, in the Primero de Enero Street, in the Roble Colony, San Nicolas de los Garza, N.L. This work was contracted with the Administration of San Nicolas de los Garza, N.L.
● Works of pluvial drainage in the Cerezos and Manzanares Streets, in Colonial de la Sierra Colony, San Pedro Garza García. It includes: excavation, channel, stone masonry and floor of reinforced concrete. This work was contracted with the Administration of San Pedro Garza Garcia, N.L.
● Work of pluvial drainage, in private lands of the Colonial de la Sierra Colony, it includes: excavation, channel of stone masonry and walls of reinforced concrete. This work was contracted with the Administration of San Pedro Garza Garcia, N.L.
● Extension of the Channel and Vehicular Bridge, located in the street Copán until Manuel L. Barragán over the Topo Chico Stream, Monterrey, N.L. it includes: Floor and walls of reinforced concrete of 6.00 mts of height, perforation of piles of 0.80 mts. of diameter and pouring concrete in place. Steel structures, formed by 3 welded plates of 26.00 mts. of length. This work was contracted with the Urban Development and Public Works Secretary.
● Pluvial drainage with pipe of prefabricated concrete in diameters of 1,83 mts and 1,50 mts with a length of 125,600 mts, It includes: excavations in Ruiz Cortinez Avenue, Monterrey, N.L. This work was contracted with the Administration of Monterrey, N.L.
● Pluvial drainage with circular duct of mixing concrete in the place of 1.22 meters diameter, at the Año de Juárez Colony, in San Nicolás de los Garza, N.L. This work was contracted with the Administration of San Nicolas de los Garza, N.L.
● Introduction of the pluvial drainage with pipe of concrete of 76 cm of diameter at the Nueva Morelos Colony, Monterrey, N.L.
● Construction of pluvial drainage with circular duct of mixing concrete in place, of 1.22m diameter, in the 14 de Mayo Street, among the Avenues Miguel Aleman and Constitucion, in Guadalupe, N.L. This work was contracted with the Urban Development and Public Works Secretary.
● Construction of the pluvial drainage in the Eugenio Garza Sada Avenue, with mixing concrete duct with 1.22 m of diameter, with a length of 835 ML. In Monterrey, N. L.
● Construction of the pluvial drainage in the "Country Naranjo" Colony, with mixing concrete duct in place, with 2.00 m and 1.22 m of diameter, with longitudes of 637 ML. and 614 ML.
● Construction of the pluvial drainage in the Francisco I. Madero Avenue, in Monterrey, N.L. with concrete duct of 1.22 m of diameter, with a length of 330 ML Including Pluvial Strainers of sidewalk and floor.
● Construction of pluvial drainage, duct of reinforced concrete f'c=250 kg/cm2 with 2.10 m of interior diameter, in the Villas de San Sebastian Residential Division, Guadalupe, N.L. This work was contracted with Proeza S.A.
● Pluvial drainage with pipe of reinforced concrete of 1.22 m of diameter, length of 760 m and channel of concrete, 1,160 m of length in the south side of the Road to Tampico, among the Avenues Diego Díaz de Berlanga and Ruiz Cortínez. This work was contracted with Provimet XXI, and the State Administration of Nuevo Leon.
● Introduction of the line of 10” of diameter, with pipe of asbestos cement and net of drinkable water system for the Fomerrey No.106 Colony, in Monterrey, N.L. This work was contracted with the Water and Drainage Services of Monterrey.
● Pluvial drainage in the construction of the Constitucion Boulevard, in Monterrey, N.L. It consists: supply and installation of pipe of reinforced concrete of 21”, 36” and 48” of diameter, construction of circular duct of reinforced concrete.
● Pluvial drainage, drinkable water system, gas and pavement, in the San Patricio Third Sector Residential Division, Second Stage, in San Pedro Garza García, N.L.
● Pluvial drainage and drinkable water system in the Jardines de las Cumbres First Sector Residential Division, in Monterrey, N.L.